Is the Thames Tideway Tunnel Beneficial for London’s Wastewater Infrastructure?

Yes. Now that it is fully connected, the Thames Tideway Tunnel is intercepting the large majority of the sewage spills that used to reach the tidal Thames in wet weather. It does not replace London’s Victorian sewers, though; it relieves them. This article explains what Tideway is, what it has achieved so far, and what it means for the people who maintain the rest of London’s drainage network.

Why London Needed a Super Sewer

London’s main sewers, built in the 19th century, carry both sewage and rainwater. When it rains heavily they fill up and discharge through combined sewer overflows (CSOs) into the river. Thames Water’s chief executive has said that London’s Victorian sewer system was built for four million people but today serves over nine million.

What Tideway Is

What It Has Achieved So Far

At full connection, Tideway reported that five and a half million tonnes of sewage had already been stopped from entering the Thames, and that with the system fully connected 95 per cent of those spills are being stopped.

Benefits for London’s Wastewater Infrastructure

  • Storage and transfer capacity for storm flows that previously had nowhere to go but the river.

  • Better river water quality, supporting wildlife and recreation.

  • Monitoring data that shows how the network behaves in storms.

What Tideway Does Not Do

Tideway protects the tidal Thames. It does not increase the capacity of local sewers, private drains or highway drainage across London, which can still surcharge and flood in intense storms. Across England, government data still recorded 291,492 storm overflow spill events in 2025. Reducing surface water entering combined sewers through SuDS, finding and fixing misconnections, and keeping local networks clean and in good repair remain essential.

What This Means for Asset Owners and Contractors

Frequently Asked Questions

Is the Thames Tideway Tunnel Finished?

All 21 connections were completed in February 2025 and the system is operational, with a period of testing in storm conditions.

Will Tideway Stop All Sewage Reaching the Thames?

Not all, but Tideway reports that around 95% of the spills from the CSOs it serves are being stopped.

Work on London’s Drainage Network

Civil Connect Subsurface Solutions surveys, maintains and rehabilitates sewers and drainage for utilities, contractors and asset owners across London and nationwide. Contact us or call 01442 966880.

Talk to a specialist

Need Expert Support with Your Drainage or Subsurface Assets?

From surveys and mapping to trenchless repairs and 24/7 response, our engineers deliver nationwide.

Call 24/7 Enquire